San Francisquito Creek bank stabilization

This report is intended to assist agencies and landowners' consultants in the planning, conceptual design, and permitting of San Francisquito Creek bank stabilization and revegetation projects. Any landowner within the study reach who is planning modifications within 50 feet of the top of the bank should first consult the recommendations in this report.

Report documents
The report consists of three documents. The Master Plan Report details the recommended bank stabilization and revegetation measures for a given creek location within the study reach. The Master Plan maps illustrate zones for which a treatment or menu of treatments is recommended. The Existing Conditions Report contains extensive site data on which the recommendations were based. Its companion piece, the Technical Appendices, includes the raw maps and data to support the findings.

All of these documents are available for reference at the City Library, the City Administration Building, and the Peninsula Conservation Center.

Project team
See the members of the project team.
San Francisquito Creek